← Detail
Tribute Communities Centre
Documents haven't been cracked yet.
Drawings
Specs
All
▾
M
Mech
10
[M-1]
SHEET No.
[M-1.1]
—
[M-2.0]
HVAC Plans
[M-2.2]
HVAC Plans
[M-3.0]
—
[M-3.1]
—
[M-4.0]
—
[M-5.0]
—
[M-1.0]
GATE VALVE
[M-2.1]
BALL VALVE
▾
P
Plumb
7
[P-3]
NEW 100A.3P FEED
[P-4]
NEW 100A.3P FEED
[P-1]
40 UNIVERSITY AVENUE, SUITE 1300
[P-2]
) ALARM
[P-7]
RP-2N
[P-6]
EXISTING
[P-5]
NEW PARTITION TYPE
▾
E
Elec
13
[E-1.0]
—
[E-1.1]
—
[E-1.2]
—
[E-1.3]
—
[E-1.4]
—
[E-1.5]
—
[E-2.0]
—
[E-2.1]
—
[E-3.0]
—
[E-3.1]
—
[E-3.3]
—
[E-3.4]
—
[E-3.2]
AUDIO/VISUAL
▾
S
Specs
0
— no spec book in this package
▾
A
Addenda
3
Add #1 — 2026-02-07
Add #2 — 2026-03-04
Add #3 — 2026-04-11
MEP Scope
Mech 10sh
Plumb 7sh
Elec 13sh
FP —
Bond Requirements
Bid Bond
10%
Performance
50%
Labour & Material
50%
Agreement to Bond
Yes
Bid bond CCDC 220 at 10% of bid price. Agreement to bond obligates bonding company to issue performance bond (CCDC 221, 50%) and labour & material payment bond (CCDC 222, 50%). All bonds by Ontario-licensed bonding company. Both bonds name Owner as Obligee.
…Instructions to Bidders {ADD-02}{ADD-03} p.4
Bid Form
Base Bid: Tribute Communities Centre — base bid submitted in Section 00 41 13
…ces Bid Form Supplement {ADD-02}{ADD-03}
Separate Prices
- Event Level Entrance Door, interview room & storage room p.1
- Event Level Rehab room (incl. new sump pit in exit stair 3) p.1
- Event Level Offices p.1
- Event Level Corridor p.1
- Event Level Exercise Room p.1
- Event Level Family Lounge, WR & Sump Pit p.1
- Level 1 Custom Shop p.1
- Level 2 Offices, Staff Kitchen & Copy Room p.1
- Level 2 Retail p.1
- Level 2 VIP Club & Pantry/Storage p.1
- Level 3 Suite p.1
- Event Level Electrical Room p.1
Scope Summary
- A Mitsubishi P-Series VRF system (36,000 BTUH cooling, 208V/1ph condensing unit PUY-A36NKA8 with wall-mount evaporator PKA-A36KA8) is being installed to serve the new hyperbaric chamber, including all refrigeration piping, fittings, and commissioning. …als - Hyperbaric Chamber - March 07 2026 p.1
- Electrical scope was revised via Addendum EA-03: electrical and low-voltage systems for the Family Lounge and VIP Club were removed from the base bid; all work for the new Event Level electrical room (lighting, lighting controls, power fixtures, fire alarm) is carried as Separate Price 1; panel circuits across RP-2B2, RP-2L, and RP-2M2 were added and removed accordingly. …SSUED FOR 100 DD&PRICING PTA.3 ELEC DWGS p.1
- HVAC equipment schedule was revised via Mechanical Addendum MA-03: evaporator units EVAP-G-1, EVAP-G-11, and EVAP-G-12 removed; COND-G-1 resized to 10-ton; COND-G-2 and COND-G-3 each resized to 3-ton; Exercise Room ductwork revised; domestic hot water tank schedule and pumps P-G-1 and P-G-2 deleted. …SSUED FOR 100 DD&PRICING PTA.3 MECH DWGS p.1
- Plumbing scope was revised: VIP Club Bar and Pantry equipment schedule removed; underground sanitary connection deleted; condensate drainage re-routed from adjacent EVAP units; condensate drainage added from the level above; existing Staff Kitchen sink relocation added on Level 01; Family Lounge north sump pit and drainage removed. …SSUED FOR 100 DD&PRICING PTA.3 MECH DWGS p.2
- Sprinkler demolition scope was revised: sprinkler demolition within the VIP Club removed from the scope; sprinkler demolition within the Exercise Room revised; existing ductwork demolition scope for future VIP Club and Retail areas revised. …SSUED FOR 100 DD&PRICING PTA.3 MECH DWGS p.3
Ask the Docs preview
— answer unavailable
Plan-Takers
Portal data — not yet collected. Requires MERX crawler extension.