MEP Services Group
← Detail

Tribute Communities Centre

HISTORICAL Bid Bond 10% Perf 50%

Documents haven't been cracked yet.

Bid Close 2026-02-12 · 15:00 local …SUED FOR 100 DD&PRICING ADD 1 ARCH SPECS p.8
Site Visit 2026-01-23 · 11:00 local
Drawings Specs All
M Mech 10
[M-1] SHEET No.
[M-1.1]
[M-2.0] HVAC Plans
[M-2.2] HVAC Plans
[M-3.0]
[M-3.1]
[M-4.0]
[M-5.0]
[M-1.0] GATE VALVE
[M-2.1] BALL VALVE
P Plumb 7
[P-3] NEW 100A.3P FEED
[P-4] NEW 100A.3P FEED
[P-1] 40 UNIVERSITY AVENUE, SUITE 1300
[P-2] ) ALARM
[P-7] RP-2N
[P-6] EXISTING
[P-5] NEW PARTITION TYPE
E Elec 13
[E-1.0]
[E-1.1]
[E-1.2]
[E-1.3]
[E-1.4]
[E-1.5]
[E-2.0]
[E-2.1]
[E-3.0]
[E-3.1]
[E-3.3]
[E-3.4]
[E-3.2] AUDIO/VISUAL
S Specs 0
— no spec book in this package
A Addenda 3
Add #1 — 2026-02-07
Add #2 — 2026-03-04
Add #3 — 2026-04-11
Mech 10sh Plumb 7sh Elec 13sh FP —
Bid Bond 10%
Performance 50%
Labour & Material 50%
Agreement to Bond Yes
Bid bond CCDC 220 at 10% of bid price. Agreement to bond obligates bonding company to issue performance bond (CCDC 221, 50%) and labour & material payment bond (CCDC 222, 50%). All bonds by Ontario-licensed bonding company. Both bonds name Owner as Obligee.
…Instructions to Bidders {ADD-02}{ADD-03} p.4
Base Bid: Tribute Communities Centre — base bid submitted in Section 00 41 13 …ces Bid Form Supplement {ADD-02}{ADD-03}
  • Event Level Entrance Door, interview room & storage room p.1
  • Event Level Rehab room (incl. new sump pit in exit stair 3) p.1
  • Event Level Offices p.1
  • Event Level Corridor p.1
  • Event Level Exercise Room p.1
  • Event Level Family Lounge, WR & Sump Pit p.1
  • Level 1 Custom Shop p.1
  • Level 2 Offices, Staff Kitchen & Copy Room p.1
  • Level 2 Retail p.1
  • Level 2 VIP Club & Pantry/Storage p.1
  • Level 3 Suite p.1
  • Event Level Electrical Room p.1
  • A Mitsubishi P-Series VRF system (36,000 BTUH cooling, 208V/1ph condensing unit PUY-A36NKA8 with wall-mount evaporator PKA-A36KA8) is being installed to serve the new hyperbaric chamber, including all refrigeration piping, fittings, and commissioning. …als - Hyperbaric Chamber - March 07 2026 p.1
  • Electrical scope was revised via Addendum EA-03: electrical and low-voltage systems for the Family Lounge and VIP Club were removed from the base bid; all work for the new Event Level electrical room (lighting, lighting controls, power fixtures, fire alarm) is carried as Separate Price 1; panel circuits across RP-2B2, RP-2L, and RP-2M2 were added and removed accordingly. …SSUED FOR 100 DD&PRICING PTA.3 ELEC DWGS p.1
  • HVAC equipment schedule was revised via Mechanical Addendum MA-03: evaporator units EVAP-G-1, EVAP-G-11, and EVAP-G-12 removed; COND-G-1 resized to 10-ton; COND-G-2 and COND-G-3 each resized to 3-ton; Exercise Room ductwork revised; domestic hot water tank schedule and pumps P-G-1 and P-G-2 deleted. …SSUED FOR 100 DD&PRICING PTA.3 MECH DWGS p.1
  • Plumbing scope was revised: VIP Club Bar and Pantry equipment schedule removed; underground sanitary connection deleted; condensate drainage re-routed from adjacent EVAP units; condensate drainage added from the level above; existing Staff Kitchen sink relocation added on Level 01; Family Lounge north sump pit and drainage removed. …SSUED FOR 100 DD&PRICING PTA.3 MECH DWGS p.2
  • Sprinkler demolition scope was revised: sprinkler demolition within the VIP Club removed from the scope; sprinkler demolition within the Exercise Room revised; existing ductwork demolition scope for future VIP Club and Retail areas revised. …SSUED FOR 100 DD&PRICING PTA.3 MECH DWGS p.3
— answer unavailable
Portal data — not yet collected. Requires MERX crawler extension.
Coming soon